Community Supermarket, Community Complex Project, Dhaka City, Bangladesh任务书

 2022-01-09 21:15:30

全文总字数:7267字

1. 毕业设计(论文)的内容和要求

(I) Design basis1. Project OverviewThis project is a practical engineering application subject in Dhaka, the capital of Bangladesh. The single-story construction area is about 1680.04m2, and the main body is four spans and five floors, and the construction area is about 8400.2m2.the main design scheme is a multi-layer reinforced concrete frame structure, partial use of concrete-filled steel tube column, class C building, structural safety level of the second level, seismic fortification intensity of 7 degrees, design basic seismic acceleration value of 0.10g, design service life of 50 years.2.Meteorological dataBasic wind pressure: 0.50kN / m23. Engineering geological data(1) The geotechnical proposed that the site is flat, with miscellaneous fill on the surface and silty clay and clay below; there is no distribution of liquefied soil layer, and the buried depth of stable groundwater level is 1.65 - 2.14 m, which is not corrosive to reinforced concrete. It is proposed to adopt reinforced concrete independent foundation under the column.(2) Foundation form: According to the engineering geological characteristics of the site and the structural load characteristics of the proposed building, it is recommended to adopt reinforced concrete independent foundation under the column, with the layer ○2 of loose clay as the bearing layer.(3) See the information in this assignment for detailed exploration.4. Structure and site seismic effects(1) The project is a multi-story frame structure, and the safety level of the building structureis level-II.(2) The seismic-resistant defense intensity of the proposed site is 7 degrees, the design basic seismic acceleration value is 0.10g, and the design earthquake group is the first group.(3) Class II project site.(4) According to the code of "Classification standard for seismic protection of buildingengineering", the project is a class-C building.5. Load ValueAdopted according to "Building Structure Load Code" GB5009-2001.6. Construction technical conditions: This project was undertaken by a construction engineering company with complete equipment and good technology.7. Material supply: Three materials and general materials can be supplied in a timely manner asplanned.8. Water and electricity supply: guaranteed by the construction unit.(2) Design content and requirementsAccording to the general plan and design requirements provided, complete the main architectural design, upper frame structure and foundation calculation, component design, joint structure design,construction drawing and other work.Specific requirements are as follows:1. Architectural partAccording to the provided general floor plan and standard layer column network layout drawing,carry out building design and complete the corresponding building construction drawing.2. Structural partThe structural layout is carried out, and the cross-sectional size of the component and the materialstrength level are selected. Design and calculation of main structures and components, including across-frame, beam-column section design, cast-in-situ floor panels, stair design, stairwell, andfoundation design. Draw construction drawings and prepare structural design calculationinstructions.3. Construction organization designThe design of construction organization should include: project overview; managementorganization; construction plan and technical measures; construction schedule (horizontal diagram);construction preparations; quality assurance measures; safe and civilized construction measures;construction layout.4. Foreign language translationTranslate foreign materials with not less than 10,000 printed symbols. The original and translatedforeign language are used as necessary attachments for the graduation design, which are bound intoseparate volumes and submitted as graduation design materials together with other achievements.

2. 实验内容和要求

3. 参考文献

[1] Su J01-2005. Construction instructions [S].

[2] Su J9503-J04-2005. Roof building structure, balcony, stairs, bathroom, sink [S].

[3] Su J9508. Outdoor Engineering [S].

剩余内容已隐藏,您需要先支付后才能查看该篇文章全部内容!

4. 毕业设计(论文)计划

Weeks 1-3 Building plan and construction drawing3.0 weeksAt the end of the third week, all construction drawings are submitted, and the construction instructor makes preliminary corrections.Week 4 Structure selection and layout and drawing of layout plans 1.0 weekWeeks 5 - 6 Calculation diagram and load calculation 2.0 weekWeeks 7 - 8 Frame internal force calculation and internal force combination Computer calculation 2.0 weekWeeks 9 - 10 Frame beam and column cross-section design, computer calculation 2.0 weekWeeks 11 Design and calculation of cast-in-situ floor panels 1.0 weekWeeks 12 Design calculation of stair structure, calculation on machine 1.0 weekWeeks 13 Basic design and computer calculation 1.0 weekWeeks 14 -15 Draw construction drawings andorganize calculations 2.0 weekWeeks 16 Review, defense, and grade 1.0 week

剩余内容已隐藏,您需要先支付 10元 才能查看该篇文章全部内容!立即支付

以上是毕业论文任务书,课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找。