本课题将对燃煤电厂燃烧后碳捕集过程进行机理建模,利用Aspen Plus量化燃烧后碳捕集装置的成本,并在此基础上实现优化过程设计。

最后把整个研究内容写成毕业论文。

毕业论文的内容和要求如下: (1)通过文献阅读和总结分析,给出如下内容:燃煤电厂碳捕集机组过程设计的研究现状,现有过程设计问题存在的问题或不足,本课题拟开展的研究内容和预期目标。

剩余内容已隐藏,您需要先支付后才能查看该篇文章全部内容!

2. 参考文献

[1] EIA U S. Capital cost estimates for utility scale electricity generating plants[R]. U. S. Department of Energy. Washington DC: U.S. Energy Information Administration, 2016.[2] Manzolini G, Sanchez Fernandez E, Rezvani S, et al. Economic assessment of novel amine based CO2 capture technologies integrated in power plants based on European Benchmarking Task Force methodology[J]. Applied Energy, 2015, 138: 546558.[3] Mac Dowell N, Shah N. Identification of the cost-optimal degree of CO2 capture: An optimisation study using dynamic process models[J]. International Journal of Greenhouse Gas Control, 2013, 13: 4458.[4] Agbonghae E O, Hughes K J, Ingham D B, et al. Optimal process design of commercial-scale amine-based CO2 capture plants[J]. Industrial Engineering Chemistry Research, 2014, 53(38): 1481514829.[5] Plus A. Rate Based model of the CO2 capture process by MEA using Aspen Plus[J]. Aspen Technology Inc, Cambridge, MA, USA, 2008.[6] Li B-H, Zhang N, Smith R. Simulation and analysis of CO2 capture process with aqueous monoethanolamine solution[J]. Applied energy, 2016, 161: 707717.[7] Alberici S, Boeve S, Van Breevoort P, et al. Subsidies and costs of EU energy[J]. An interim report, Ecofys, by order of European Commission, 2014.[8] 程亮, 张昌建, 张超, 等. 基于Aspen Plus 的燃煤电厂CO2捕集系模拟分析[J]. 河北工程大学学报:自然科学版, 2019: 5153.[9] 姜大霖, 杨琳, 魏宁, 等. 燃煤电厂实施CCUS改造适宜性评估:以原神华集团电厂为例[J]. 中国电机工程学报, 2019, 39(19): 5835-5842 5912.[10] Boot-Handford M E, Abanades J C, Anthony E J, et al. Carbon capture and storage update[J]. Energy Environmental Science, 2014, 7(1): 130189.[11] Sharifzadeh M, Bumb P, Shah N. Carbon capture from pulverized coal power plant (PCPP): Solvent performance comparison at an industrial scale[J]. Applied energy, 2016, 163: 423435.[12] Sharifzadeh M, Shah N. MEA-based CO2 capture integrated with natural gas combined cycle or pulverized coal power plants: Operability and controllability through integrated design and control[J]. Journal of Cleaner Production, 2019, 207: 271283.[13] 自查文献...

剩余内容已隐藏,您需要先支付 10元 才能查看该篇文章全部内容!立即支付

以上是毕业论文任务书,课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找。