Residential Building of District Project of Dhaka city in Bangladesh任务书

 2022-01-09 21:12:53

全文总字数:7273字

1. 毕业设计(论文)的内容和要求

(I) Design basis1. Project OverviewThis project is a Residential Building of District Project of Dhaka city in Bangladesh. The singlestory building area is about 558.6m2, the main body is five spans and five floors, and the building area is about 4468.8m2. The main structure is a multi-storey reinforced concrete frame structure with steel reinforced concrete columns in some parts. It is a class C building. The structural safety level is grade II, the seismic fortification intensity is 7 degrees, the design basic seismic acceleration valueis 0.10g, and the design service life is 50 years.2. Meteorological dataBasic wind pressure: 0.50kN / m23. Engineering geological data(1) The geotechnical proposed that the site is flat, with miscellaneous fill on the surface andsilty clay and clay below; there is no distribution of liquefied soil layer, and the buried depth of stablegroundwater level is 1.65 - 2.14 m, which is not corrosive to reinforced concrete. It is proposed toadopt reinforced concrete independent foundation under the column.(2) Foundation form: According to the engineering geological characteristics of the site and the structural load characteristics of the proposed building, it is recommended to adopt reinforced concrete independent foundation under the column, with the layer ○2 of loose clay as the bearing layer.(3) See the information in this assignment for detailed exploration.4. Structure and site seismic effects(1) The project is a multi-storey frame structure, and the safety level of the building structure is level-II.(2) The seismic-resistant defense intensity of the proposed site is 7 degrees, the design basic seismic acceleration value is 0.10g, and the design earthquake group is the first group.(3) Class II project site.(4) According to the code of "Classification standard for seismic protection of buildingengineering", the project is a class-C building.5. Load ValueAdopted according to ACI Code 318.6. Construction technical conditions: This project was undertaken by a construction engineeringcompany with complete equipment and good technology.7. Material supply: Three materials and general materials can be supplied in a timely manner asplanned.8. Water and electricity supply: guaranteed by the construction unit.(2) Design content and requirementsAccording to the general plan and design requirements provided, complete the main architecturaldesign, upper frame structure and foundation calculation, component design, joint structure design,construction drawing and other work.Specific requirements are as follows:1. Architectural partAccording to the provided general floor plan and standard layer column network layout drawing,carry out building design and complete the corresponding building construction drawing.2. Structural partAccording to ACI code 318, the structural layout is carried out, and the cross-sectional size of thecomponent and the material strength level should be selected. Design and calculation of main structures and components, including a cross-frame, beam-column section design, cast-in-situ floor panels, stair design, stairwell, and foundation design. Draw construction drawings and prepare structural design calculation instructions.3. Construction organization designThe design of construction organization should include: project overview; management organization; construction plan and technical measures; construction schedule (horizontal diagram); construction preparations; quality assurance measures; safe and civilized construction measures; construction layout.4. Foreign language translationTranslate foreign materials with not less than 10,000 printed symbols. The original and translated foreign language are used as necessary attachments for the graduation design, which are bound into separate volumes and submitted as graduation design materials together with other achievements.

2. 实验内容和要求

3. 参考文献

[1] Su J01-2005. Construction instructions [S].

[2] Su J9503-J04-2005. Roof building structure, balcony, stairs, bathroom, sink [S].

[3] Su J9508. Outdoor Engineering [S].

剩余内容已隐藏,您需要先支付后才能查看该篇文章全部内容!

4. 毕业设计(论文)计划

Weeks 1-3 Building plan and construction drawing 3.0 weeksAt the end of the third week, all construction drawings are submitted, and the construction instructor makes preliminary corrections.Week 4 Structure selection and layout and drawing of layout plans 1.0 weekWeeks 5 - 6 Calculation diagram and load calculation 2.0 weekWeeks 7 - 8 Frame internal force calculation and internal force combination Computer calculation 2.0 weekWeeks 9 - 10 Frame beam and column cross-section design, computer calculation 2.0 weekWeeks 11 Design and calculation of cast-in-situ floor panels 1.0 weekWeeks 12 Design calculation of stair structure, calculation on machine 1.0 weekWeeks 13 Basic design and computer calculation 1.0 weekWeeks 14 -15 Draw construction drawings andorganize calculations 2.0 weekWeeks 16 Review, defense, and grade 1.0 week

剩余内容已隐藏,您需要先支付 10元 才能查看该篇文章全部内容!立即支付

以上是毕业论文任务书,课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找。